How to get started with an AI project: team, timeline and budget
Begin with a single question, a small team, roughly twelve weeks and a finish line written down before any work starts. At the end you choose to continue, fix and retry, or stop. Any of the three is a good result if you learned it without spending much.
Run it like a restaurant test kitchen
A restaurant chain does not put a new dish on every menu at once. It cooks it in one kitchen, serves it to a few regular customers, and asks for their honest opinion.
A single dish, cooked in a single kitchen for real customers, with the decision date fixed in advance.
The comparison has a limit. Once a recipe works, it is done. An AI assistant, by contrast, can never be better than the documents it reads, which means somebody must go on maintaining them once the trial is over.
This guide assumes you already know which question the assistant should answer. If you have not chosen one yet, our guide to choosing your first project is the place to begin.
Who you need: six roles, most of them part-time
You do not need to create an AI department. You need a handful of people who already understand the work, and a realistic share of their time.
| Role | What they do | Time needed |
|---|---|---|
| Sponsor | A senior leader who wants the outcome and can remove obstacles. | About an hour a week, plus the final decision. |
| Project owner | A single person in charge of the daily running, accountable for reaching the finish line. | Around half their week. |
| Document owners | Whoever already maintains the handbook or policies that the assistant will draw on. | Several hours weekly, heavier at the start. |
| Expert checkers | A small group, two or three people, who can tell a correct answer from a wrong one and grade what the assistant says. | Several hours weekly while testing runs. |
| Builder | Either your IT department or an outside firm; they set the system up and connect it to the documents. | The only role close to full-time, during the build. |
| Access lead | Usually someone from IT or security, who makes sure people only see what they are permitted to see. | A few days, early on. |
These time figures are rough rules of thumb, not survey results, and yours will depend on the size of the job. For more on the access role, see who may see each document.
Twelve weeks in three stages
Here is how a typical first project might unfold. Treat it as an illustration, not a promise; if the documents are in poor shape, stage one stretches by several weeks.
Stage one, the first four weeks: preparation
Record the 'before' number and agree the finish line. Gather 50 real questions with known answers. Clean up the documents this project will use.
Stage two, weeks five through eight: building and grading
The assistant is set up on those documents. Your experts grade its answers to the 50 questions, and wherever it went wrong, the documents get corrected.
Stage three, the final four weeks: a trial with real users
For their everyday work, a handful of the intended users rely on it, with a button to flag a wrong answer. Then measure the results against the finish line and make the call.
To estimate how long your first stage will take, our guide on whether your information is ready includes a test you can run in an afternoon.
Where the budget goes: mostly staff time
Our cost guide walks through an invented company of 800 people that spends about $95,000 in year one on an HR help desk, covering document preparation, the build and answer checking. The AI fees add less than $1,000 on top. Those numbers illustrate the shape of a budget; they are not data.
Because most of the document work and the build happen inside these first twelve weeks, expect the bulk of the first year's spending early. Count your own staff's hours as a real cost, even though no invoice arrives for them.
Put the money into people and documents. The AI fees are the minor item.
Define success in writing before you build
Settle these questions before anything is built. Once the project is underway, everyone's memory of the goal starts to drift.
- What is the 'before' number? For instance, how long it takes today to answer an HR question.
- How accurate does it need to be? Your experts grade it on the 50 test questions.
- Will people actually use it? Set a target for how many in the trial group use it, and how often, by the end of week twelve.
- What will it save? Measure it against the 'before' number: minutes saved on each answer, or a drop in questions the experts have to field.
- What result means stop? Decide this now, so that stopping is a choice rather than a failure.
Whether the assistant is right often enough is its own question; our guide on trusting the answers explains how to measure it.
Three ways to run the project
1. Your own team
Your IT department builds it with an AI vendor's model and tools.
- Suits you when: you have developers with spare capacity and you want to keep the know-how in-house.
- The trade-off: speed. A first project is a learning exercise for the team, and the timeline reflects that.
2. A ready-made product
You buy a tool that is already linked to the places your documents live; office software with an assistant built in is a common example.
- Suits you when: you want a fast start and your documents already sit in that vendor's tools.
- The trade-off: you have less say in how answers are found and checked, and the price is frequently charged per person across the whole company.
3. Working with a partner firm
An outside firm does the building together with your staff, and afterwards either passes it to them or continues to operate it.
- Suits you when: it is your first project and nobody inside has done one before.
- The trade-off: more spending at the start, and your staff must pick up enough knowledge to take ownership later.
How first projects go off track
- No finish line. The test never formally ends; it just fades away.
- Experts without time. No one checks the answers, so no one trusts them.
- The wrong test group. The IT team loves it, while the people it was built for never try it.
- Nobody owns it once the trial ends. The documents slip out of date, and the answers do too.
- Scope creep partway through. 'While we are at it, let's add finance.' Finish the first question before taking on a second.
Questions to put to your team or vendor
- Who is sponsoring this, and who manages it from one day to the next?
- Which people do we need, for how many hours, and have their managers agreed to release them?
- What is our starting measurement, and which result, reached by which date, tells us to continue, fix or stop?
- Is the trial group made up of the people who will really use it?
- Once the trial is over, who is responsible for the assistant and for the documents it reads?
Terms you are likely to hear
- Pilot: a first project limited in size and duration, used by real people and judged against a clear success measure.
- Proof of concept (POC): an earlier, narrower test of whether the idea works at all, frequently run on sample documents with no real users involved.
- MVP (minimum viable product): the most basic version that is still useful enough to put in front of real people.
- KPI (key performance indicator): the handful of numbers, usually one or two, used to judge the project.
- Sponsor and stakeholders: the sponsor is the senior executive championing the project; stakeholders are all the people it touches.
- Rollout: extending access beyond the pilot group, typically step by step.
How we help
Describe the question you want the assistant to answer and tell us where the documents are kept. We will sketch the team, the twelve-week plan and an honest budget with you, including your own people's time.
Before anything is built, we help you write down the 'before' number, the accuracy you need, the usage you expect and the result that would mean stopping, and we gather the 50 test questions with your experts.
We can be the builder, working alongside your people so they learn enough to own it, and we make sure the plan names who owns the documents after week twelve.
Talk to us about your project